Airport
Greater Orlando Airport
Authority
Taxiway and Bridges
Orlando, FL
|
|
|
James Construction Group was
awarded the contract to
construct two taxiway
bridges and replace the
depressed roadway sections
of Heintzeman Boulevard.
Project Scope:
·
Dewatering the site
·
75,000 CY of excavation for
roadway/embankments,
trenches
·
Installation of 53,600 LF of
concrete piling
·
Installation of 6,680,000
pounds reinforcing steel
·
Placement of 54,855 CY of
concrete for taxiway bridge
abutments, piers, boat slab
sections, bridge decks
·
Installation of 920 LF of
prestressed precast bridge
beams
·
Excavation and installation
of 9,100 LF 18″ to 60″
reinforced concrete pipe
Project Value:
$20,700,000
|