HOME   |   EMPLOYEE LOG-IN   |  CONTACT US


Highway & Bridge

Texas DOT
SH 36 Milam County
Cameron, TX

   
 

In August 2004, JCG began work on this multifaceted project in the heart of Central Texas. The work scope involved the following:

 

Project Scope:

 

·    Laying a 4-lane divided highway

·    Construction of a 3,200 LF bridge

·    Demolition of the existing 3,200 LF bridge

·    Removal and rebuilding of an existing railroad bridge

 

Construction Activities:

 

·    192,000 CY of excavation

·    553,000 CY of embankment

·    154,000 SY of lime-treated subgrade

·    41,791 tons of type C hot mix

·    154,532 SY of 10″ continuously reinforced concrete pavement, batched and paved by an onsite JCG portable concrete batch plant

 

Project Value:  $26,407,000

 

11200 Industriplex Boulevard, Suite 150   Baton Rouge, Louisiana 70809   Phone 225.295.4830   Fax 225.295.4840

Site development by Keith A Horton, LLC