Highway & Bridge
Louisiana DOTD
Jackson Parish Line -
Junction 3061
Ruston, LA
|
|
|
In late 2003, the Louisiana
DOTD awarded James
Construction Group the
contract to expand U.S. 167
from a two-lane to a
four-lane divided highway
incorporating grading,
drainage structures, Class
II base course, asphaltic
concrete pavement, and two
10-span flat-slab bridges.
Construction began in March
2004.
Project Scope:
·
Placement of 409,095 cm of
embankment
·
201,879 cm of excavation
·
50,811 cm of muck excavation
·
136,192 cm of Class II base
course
·
112,550 m2 of subgrade layer
(cement treated)
·
35,046 mg of asphaltic
concrete
·
1,844 meters of 16″ precast
concrete piles
·
Various cross-drain and
side-drain pipes
Project Value:
$13,596,000
|