Industrial
Technip USA
Valero St. Charles Refinery
Norco, LA
|
|
|
Technip USA awarded James
Construction Group phase I
of the mechanical work at
Valero Refining, which was
adding a new hydrogen unit
to its existing facility in
Norco, Louisiana. As
mechanical subcontractor,
JCG erected two reformers.
The construction activities
included the following:
· Erection of radiant and
convection sections
· Installation of an
ammonia vaporization skid
· Equipment setting
(pumps, pump skids, fin
fans, modular structural
steel racks, PSAs, reactors,
desulfurizers, ductwork, and
stacks)
· Installation of
refractory
· Installation of steel
supports/platforms, ladders,
and stairs
· Fabrication of
aboveground 1″ to
24″-diameter carbon steel,
stainless steel, and exotic
metals pipe
· Hydrotesting of piping
systems
Project Value:
$23,000,000
|