Industrial
Air Products & Chemicals
Reformer & Co-Gen Facility
Port Arthur, TX
|
|
|
James Construction Group was
awarded multiple contracts
to perform the civil phase
and the mechanical
construction activities on
Phases I and II of the Port
Arthur facility.
Civil Phase:
·
Grading and excavation
·
Installation:
– Underground piping
(6″ process drainage pipe,
4″ sanitary lines, a 3″ HDPE
water line, 12″ CS natural
gas line, and 4″ and 2″ CS
process drainage pipe)
– Underground
electrical duct banks and
manholes
– Mud sills
·
Placement of grounding
grid in foundations
·
Preparation of piles to
receive the foundations
Mechanical Phase:
·
Setting:
– Surge drums
– PSA system
– Process gas
boiler
·
Installation:
– Steel for
steam piping
– Outlet
manifolds and tubes
– Convection
section modules
– Steam piping
and steam drum
– Refractory and
brick tunnels in radiant box
– Burners, gas
piping, full piping, inlet
headers, and pigtails
·
Erection:
– Support steel for
radiant box and convection
sections
– Radiant box
– Process piping
modules, vessels, steam
turbine generator
– Three-cell
cooling tower with pumps and
piping
– Two multiservice
compressors with motors,
steel, and piping
– Erection,
support, and testing of
interconnecting process
piping
Project Value:
$31,000,000
|