Montgomery Watson Harza
Northeast Water Purification System
Humble, TX

   
 

James Construction Group performed phases I and II of the mechanical work on this 40-million-gallon-per-day water purification plant.

 

Project Scope:

·    Installation:

      6549 LF of carbon steel cement lined pipe ranging from 30″ to 66″ and 2,646 LF of carbon steel small bore pipe ranging from 1/2″ to 8″

      328 LF of stainless steel small bore pipe and 815 LF of stainless steel large bore pipe

      49,644 LF of PVC pipe

      2,828 LF of ductile iron pipe

      All underground and aboveground process mechanical piping

·    Setting and installation:

·    Flocculation/sedimentation

·    Setting of ground storage tank

·    Construction of raw water pump station and UV building metering station

 

Project Value:  $14,000,000

 