Industrial
Montgomery Watson Harza
Northeast Water Purification
System
Humble, TX
|
|
|
James Construction Group
performed phases I and II of
the mechanical work on this
40-million-gallon-per-day
water purification plant.
Project Scope:
·
Installation:
–
6549 LF of carbon steel
cement lined pipe ranging
from 30″ to 66″ and 2,646 LF
of carbon steel small bore
pipe ranging from 1/2″ to 8″
–
328 LF of stainless steel
small bore pipe and 815 LF
of stainless steel large
bore pipe
–
49,644 LF of PVC pipe
–
2,828 LF of ductile iron
pipe
–
All underground and
aboveground process
mechanical piping
·
Setting and installation:
·
Flocculation/sedimentation
·
Setting of ground storage
tank
·
Construction of raw water
pump station and UV building
metering station
Project Value:
$14,000,000
|