Industrial
Air Products & Chemicals
Hydrogen Plant Construction
Westlake, LA
|
|
|
James Construction Group,
with its diverse
capabilities, performed
several phases of work on
the Westlake hydrogen
facility, including the
civil phase and the
mechanical construction
activities on Phases I and
II.
Project Scope:
Civil
·
Demolition and abandoned
pipeline removal
·
Stripping, excavation, and
embankment
·
Installation of 660 LF of
24″ PVC pipe and 100 LF of
8″ HDPE firewater pipe
·
Placement of 5,000 tons 610
bahama stone
·
Erected formwork for 19
interconnecting foundations
·
Installed rebar, anchor
bolts and embeds
·
Placed 6,200 CY of concrete
foundations
Mechanical
·
Erection and assembly:
– Reformer and
associated equipment
– Elevated flare
stack and associated piping
– Air cooler support
system and associated
components
·
Setting 1,858 tons of
equipment
·
Installation:
– Nine large
process module skids
– Hydrogen
compressor skid and motor
– Water treatment
system
– Oil/water
separation system
– Ammonia injection
system skid leveling
– 28,000 LF of 1/2″
to 30″ process pipe
– Installation of
10,000 LF of radiant tubes
·
732 tons of refractory lined
ductwork
·
284 tons of panels for
radiant box
·
Equipment erection:
– 450 tons structural
steel
– Shell and tube heat
exchanger
– Power distribution
center and analyzer
buildings
·
Precommissioning
·
System testing and turnover
Project Value:
$10,400,000
|