HOME   |   EMPLOYEE LOG-IN   |  CONTACT US


Infrastructure

Honeywell Specialty Chemicals
Stack 7A Construction
Geismar, LA

   
 

This project involved construction of a 35-acre gypsum stack landfill. The scope of work included the following:

 

·    Cut and fill activities

·    Transportation of 177,000 CY of clay borrow material

·    Placement of geonet, fluorogypsum ballast, and 7,600 tons of road base

·    Installation of gravel drain, drain outlets, culverts, and concrete and erosion mat

 

Project Value: $5,465,000

 

 

 

 

11200 Industriplex Boulevard, Suite 150   Baton Rouge, Louisiana 70809   Phone 225.295.4830   Fax 225.295.4840

Site development by Keith A Horton, LLC